Valsts valodas centra izstrādātie transporta, infrastruktūras un sakaru termini
Terminu kolekcijā apkopoti Valsts valodas centra izstrādātie transporta, infrastruktūras un sakaru termini.
Grupa: Valsts valodas centrs
Nozare: Transports. Infrastruktūra. Sakari
Konteksts: [..] As a good practice, a measurement of the photometric parameters may be used for the evaluation of the switch-over time. 1) If the switch-over time is greater than 1 second, the following corrective actions may be used to decrease the switch-over time: i) use of enhanced constant current regulators (CCR); or ii) use of uninterruptible power supply (UPS). [..]
Avots: CS-ADR-DSN. Certification Specifications and Guidance Material for Aerodromes Design, Issue 3, 8 December 2016
Kolekcija: Valsts valodas centra izstrādātie transporta, infrastruktūras un sakaru termini
Nozares: Transports. Infrastruktūra. Sakari, Transports. Infrastruktūra. Sakari