daļēja nodošana ekspluatācijā - Latvijas Nacionālais terminoloģijas portāls

Valsts valodas centra izstrādātie transporta, infrastruktūras un sakaru termini

Terminu kolekcijā apkopoti Valsts valodas centra izstrādātie transporta, infrastruktūras un sakaru termini.

Grupa: Valsts valodas centrs

Nozare: Transports. Infrastruktūra. Sakari

en
Initial Operational Capability

Konteksts: [..] The specific and detailed changes (called "operational improvements [01] steps)") required to transition from today's system have been structured in a series of ATM Service Levels (0-5)1 and organized in Implementation Packages 1-3 depending upon the date at which the corresponding capability can become operational (Initial Operational Capability (IOC) date) [..]
Avots: Air Traffic Management Master Plan

Initial Operating Capability
IOC

Konteksts: [..] The specific and detailed changes (called "operational improvements [01] steps)") required to transition from today's system have been structured in a series of ATM Service Levels (0-5)1 and organized in Implementation Packages 1-3 depending upon the date at which the corresponding capability can become operational (Initial Operational Capability (IOC) date) [..]

Avots: Air Traffic Management Master Plan

lv
daļēja nodošana ekspluatācijā

Kolekcija: Valsts valodas centra izstrādātie transporta, infrastruktūras un sakaru termini

Nozares:  Transports. Infrastruktūra. Sakari, Transports. Infrastruktūra. Sakari

Veidosim 21. gadsimta latviešu valodu visi kopā.

Iesaisties terminrades procesā – iesaki, komentē, balso!

Iesaistīties terminradē